Above Target
Bike-Ped Infrastructure Projects in Construction
Town of Carrboro FY26 Priorities

Goals

Not Defined
Expand the Multimodal Transportation Network
Town of Carrboro FY26 Priorities

Update

As of FY Q2-26, the Town has two bike-ped infrastructure projects under construction, including: 

  • Bike Loop Detection (U-4726-DF) at three intersections downtown and West Poplar/NC Hwy 54
  • NC 54 Pedestrian Improvements (BL-0044) NCDOT awarded the bid.

The Town completed the Roberson St. Resurfacing/Restriping project in FY Q1-26.

To learn more, visit the Town’s Transportation Projects webpage.

Next Steps

  • Ongoing: Continue pursuing state and federal funding to advance bike-ped projects
  • The bike loop detectors (U-4726DF) have been installed.  NCDOT inspection and project close-out.
  • Next for Construction: Phase 1 of the Morgan Creek Greenway (EL-4828A) was advertised for construction in November 2025 with the bid opening held on December 18, 2025. The Town is anticipated to award the bid and enter into a contract with a contractor to construct in January 2026 thus shifting the project to the construction phase.
  • Next for Construction: the NC 54 Pedestrian Improvements (BL-0044) are scheduled to get underway in February 2026.

Bike-Ped Infrastructure Projects in Construction

Chart

Combination chart with 2 data series.
Bike-Ped Infrastructure Projects in Construction (Chart Type: Combo) Plot Bands FY 2022 Actual: 1 Target: 1 FY 2023 Actual: 2 Target: 1 FY 2024 Actual: 2 Target: 1 FY 2025 Actual: 2 Target: 1 FY Q1-26 Actual: 2 Target: 1 FY Q2-26 Actual: 2 Target: 1 FY Q3-26 Actual: No Value Target: No Value FY Q4-26 Actual: No Value Target: No Value
The chart has 1 X axis displaying categories.
The chart has 1 Y axis displaying values. Data ranges from 1 to 2.
End of interactive chart.

Measure Data

Last Calculated
Period
Not Defined
Status
Actual
Target
FY 2022Above TargetAbove Target11
FY 2023Above TargetAbove Target21
FY 2024Above TargetAbove Target21
FY 2025Above TargetAbove Target21
FY Q1-26Above TargetAbove Target21
FY Q2-26Above TargetAbove Target21