Below Plan
Number of sidewalk repairs completed.
Town of Carrboro FY26 Priorities

Update

Sidewalk repairs include the installation of six ADA-compliant sidewalk ramps along Tar Hill Drive.   The number of repairs is measured by the number of sidewalk segments that have repairs on them, not on individual panels repaired within the segment.   For example, if there is a sidewalk between two streets that is 300' long and has 3 panels that are damaged and need repair, this work would be counted as only 1 sidewalk repair, while 3 panels are replaced.   

Next Steps

The next steps for sidewalk repairs include conducting inspections to pinpoint high-priority areas. The extent and schedule of improvements will be determined by the available funding.

Number of sidewalk repairs completed.

Chart

Combination chart with 2 data series.
Number of sidewalk repairs completed. (Chart Type: Combo) Plot Bands FY 2022 Actual: 43 Target: No Value FY 2023 Actual: 38 Target: No Value FY 2024 Actual: 5 Target: No Value FY 2025 Actual: 18 Target: 16 FY Q1-26 Actual: 2 Target: 4 FY Q2-26 Actual: 0 Target: 4 FY Q3-26 Actual: No Value Target: 4 FY Q4-26 Actual: No Value Target: 4
The chart has 1 X axis displaying categories.
The chart has 1 Y axis displaying values. Data ranges from 0 to 43.
End of interactive chart.

Measure Data

Last Calculated
Period
Not Defined
Status
Actual
Target
FY 2022No InformationNo Information43
FY 2023No InformationNo Information38
FY 2024No InformationNo Information5
FY 2025Above TargetAbove Target1816
FY Q1-26Below PlanBelow Plan24
FY Q2-26Below PlanBelow Plan04
FY Q3-26No InformationNo Information4
FY Q4-26No InformationNo Information4