Above Target
Length of added sidewalks and greenways, including S. Greensboro St sidewalk.
Town of Carrboro FY26 Priorities

Update

The Town completed the installation of 230 feet of new sidewalk along Roberson Street, spanning from Maple Avenue to Sweet Bay Place. The sidewalk construction complies with ADA standards, including accessible curb ramps and gutter design.

 

Next Steps

Continued efforts should be made to identify areas in need of sidewalk installation, prioritizing high-traffic zones to enhance pedestrian connectivity. Future planning will include evaluating streets in the resurfacing program for possible sidewalk integration. Potential challenges such as funding limitations, planning delays, and resource constraints may affect implementation.

Length of added sidewalks and greenways, including S. Greensboro St sidewalk.

Chart

Combination chart with 2 data series.
Length of added sidewalks and greenways, including S. Greensboro St sidewalk. (Chart Type: Combo) Plot Bands FY 2022 Actual: 55 Target: No Value FY 2023 Actual: 0 Target: No Value FY 2024 Actual: 0 Target: No Value FY 2025 Actual: 320 Target: 200 FY Q1-26 Actual: 230 Target: 0 FY Q2-26 Actual: 0 Target: 0 FY Q3-26 Actual: No Value Target: 0 FY Q4-26 Actual: No Value Target: 200
The chart has 1 X axis displaying categories.
The chart has 1 Y axis displaying values. Data ranges from 0 to 320.
End of interactive chart.

Measure Data

Last Calculated
Period
Not Defined
Status
Actual
Target
FY 2022No InformationNo Information55
FY 2023No InformationNo Information0
FY 2024No InformationNo Information0
FY 2025Above TargetAbove Target320200
FY Q1-26Above TargetAbove Target2300
FY Q2-26Above TargetAbove Target00
FY Q3-26No InformationNo Information0
FY Q4-26No InformationNo Information200