This project provides for the replacement of SE 5th Avenue Bridge, which was built in 1959. The plans derive from the assessments in FDOT's Bridge Management System Report. The Report includes recommendations for repairs and/or replacements to the deck, superstructure, and substructure components, pilings and jackets. The bridge will be raised to match the vertical clearance at US 1/Federal Highway.
Progress Update | |
Template was fully assembled along West side of South bank
Initiated concrete sheet pile installations for South side seawall, and since steel sheet piles have been installed along North and South banks, no further erosion has been noted
First four concrete sheet piles for South side seawall have been installed
Drainage structures on South side have been moved to West side of staging area
Rebar arriving on site, and assembling rebar cage for Bent 4 pile cap along East side of North crane
Continuing to load unnecessary equipment onto trailers for removal from site