Project Objectives |
This project provides for the replacement of SE 5th Avenue Bridge, which was built in 1959. The plans derive from the assessments in FDOT's Bridge Management System Report. The Report includes recommendations for repairs and/or replacements to the deck, superstructure, and substructure components, pilings and jackets. The bridge will be raised to match the vertical clearance at US 1/Federal Highway.
Progress Update | |
Initiating steel sheet pile cutoffs along North side.
Keith on site shooting as-builts of piles.
Template components moved to North side prior to concrete sheet pile installations.
All old sea wall sections have been removed along North bank.
Steel H pile used to soften soil prior to pile extractions is still in the mud next to Bent 3.
Rigging staged on North side of crane, as well as the last remaining cut off pile head.