  • Enhance pedestrian safety and multi-modal transportation.
  • Conduct traffic mitigation evaluations of primary corridors. (YR 1)
  • Prioritize transportation related capital expenditures
  • Continue to implement strategies to facilitate safe and efficient traffic flow in and around Baytown. (YR 2)
  • Continue the expansion and marketing of the trail system in Baytown. (YR 3)
  • Implement strategies to expand pedestrian/bicycle options and improve safety. (YR 2)
  • Continue to implement strategies to facilitate safe and efficient traffic flow in and around Baytown (YR 2)
  • Improve safety and mobility along Garth Corridor
  • Improve lighting and striping on major corridors. (YR 2)
  • Improve water, sewer, and drainage system and infrastructure. (YR 2)
  • Begin the process of reconstruction Garth Road. (YR 4)
  • Implement strategies to expand pedestrian/bicycle options and expand mobility options. (YR 4)
  • Continue improvements to water, sewer, and drainage systems. (YR 4)
  • Measures
  • Outcome Measure Dashboard
  • Citizen satisfaction with the overall flow of traffic and congestion management in Baytown
  • Number of road intersections with adaptive traffic programming
  • Roadway accidents
  • Citizen satisfaction with the overall maintenance of city streets
  • Total miles of city streets rehabilitated
  • Sidewalk and curbing rehabilitated/constructed
  • Citizen satisfaction with the maintenance of sidewalks in Baytown
  • Citizen satisfaction with the availability of sidewalks
  • Total miles of trails and bike paths in Baytown
  • Percentage of signalized intersections with pedestrian crossings
  • Initiatives
  • Develop a budgetary practice of reserving a portion of revenue to be focused on capital needs.
  • Complete Santavy from Garth to San Jacinto.
  • Continue to prioritize police visibility in high traffic areas.
  • Develop and execute creative events to promote the use of Baytown's trail system.
  • Acquire ROW along Hunt from Arabella to Main.
  • Augment/extend synchronization of signals and implementation of smart intersections.
  • Increase citizen awareness of trails through a targeted marketing campaign
  • Work with development to complete Hunt from San Jacinto to John Martin.
  • Continue working with TXDOT to implement on/off ramp reversals between Garth and John Martin.
  • Study potential roundabout at Texas Avenue/Market Street/Decker Drive as well as other traffic coordination measures from Sterling Avenue to Lee Drive.
  • Actively pursue the conversion of the abandoned Union Pacific rail line into a hike/bike trail.
  • Implement measures to address impacts of opening San Jacinto Boulevard.
  • Implement strategies from the Safe Routes to Schools & Trails assessment to connect neighborhoods to the existing trail system.
  • Test the feasibility of a Hutto extension to Spur 330.
  • Develop and begin execution of a strategy to connect the Goose Creek Trail from the current northern point at Baker Road to the new trail along San Jacinto Boulevard.
  • Continue pursuit and application for grant funding associated with Garth expansion.
  • Augment egress safety at Fire Station #1.
  • Continue pursuit of and application for grant funding associated with major transportation projects (Cedar Bayou crossing, Garth Rd., etc.)
  • Evaluate traffic loads on Alexander and Bayway and prescribe possible alleviation methods (YR1).
  • Continue to work with State and regional partners to advocate and implement flow and safety measures on major transportation corridors.
  • Study and develop recommendations to address traffic flow challenges on Sjolander Road, south of Interstate 10.
  • Work with developers to provide trail connectivity to the current system and to accommodate bicycle mobility.
  • Continue the installation of trail heads and trail markers.
  • Cooperate with Harris County Precinct 2 to improve county roadways.
  • Continue the implementation of the Sidewalk Master Plan.
  • Continue inter-jurisdictional cooperation in analysis of SH146.
  • Add pedestrian safety measures to Garth Road and Baker Road.
  • Develop and begin execution of a strategic transportation plan (YR 1).
  • Continue the implementation of the Trails Master Plan.
  • Continue to encourage and cooperate with TXDOT to improve traffic circulation at 330 and I-10.
  • Augment lighting along North Alexander and east Cedar Bayou Lynchburg.
  • Evaluate lighting on all major corridors of town and add lighting as necessary.
  • Install pedestrian ramps and crossing mechanisms.
  • Augment street striping.
  • Develop a trails master plan.
  • Identify, develop, and implement a citizen assistance program related to lateral sewer line replacement.
  • Improve lighting at intersections.
  • Address chronic neighborhood flooding issues (example: E. James Street, Allenbrook, etc.).
  • Continue implementation of sidewalk master plan.
  • Augment ditch maintenance program.
  • Continue to work with Metro to ensure continuation of Park/Ride Program.
  • Work with CenterPoint to augment LED replacement.
  • Begin marketing/promoting trails.
  • Construct a finance plan for approximately $60 million in a reconstruction project based on the principles of generational equity, cash-flow management, and inter-jurisdictional cooperation and participation.
  • Commission the redesign of Garth Road to accommodate a six-lane thoroughfare from I-10 South to Baker Road, piped storm ditches, buried utilities, redesigned intersections, landscaped medians, new decorative lighting, and pedestrian/bicycle conductivity.
  • Develop a construction phasing plan.
  • Assemble citizen group to monitor, advise, and advocate. Use outreach events and other strategies to communicate the importance of this initiative.
  • Complete the development of the Sidewalk and Trails Master Plans.
  • Emphasize filling sidewalk gaps.
  • Begin development of Mall to Marina (Goose Creek Phases 7 and 8).
  • Explore and begin to plan for additional trail connectivity (i.e. - Texas Avenue connection to Goose Creek Trail).
  • Continue to cooperate with Harris County for additional sidewalk transit funding. Also pursue shading structures as all bus stops (YR4).
  • Pursue discussion with Harris County Transit regarding addition of route between north hotels/mall area and Bayland Island.
  • Investigate and develop recommendation specific to self-serve bicycle rentals along trails.
  • Take advantage of opportunities to designate and/or install bike lanes. (e.g. - Market Street)
  • Work with Union Pacific to finalize abandonment of UP's Evergreen rail line.
  • Implement a citizen assistance program related to lateral sewer line replacement.
  • Continue to address chronic neighborhood flooding issues (e.g. - state streets, Texas Avenue, Bayou Oaks, Fayle Street, etc.) utilizing the new storm water master plan.
  • Continue to aggressively address ditch maintenance, using prioritization similar to PCI methodology.
  • Discuss with Comcast localized fiber needs and opportunities.
  • Continue addressing SSOI, growth, and annexation utility needs.

Measures

2. Infrastructure & Mobility
Measures Owner Period Analysis Recommendations
Off Target
Citizen satisfaction with the overall flow of traffic and congestion management in Baytown
BM
Brian Moran
May-21

The City continues to invest significant resources into improving the flow of traffic in Baytown.  This includes major projects like the construction of San Jacinto Blvd. and connecting Hunt Rd. from John Martin to N. Main, along with more strategic projects like improvements to the synchronization systems on Garth, N. Main and SH146, adding right turn lanes at key intersections, and adding smart technology to intersections throughout the City.

On Target
Number of road intersections with adaptive traffic programming
BM
Brian Moran
Q3-20-21

The City continues to add adaptive programming to key intersections throughout the City.  Over the two years, fourteen intersections have been converted to adaptive programming.

Not Defined
Roadway accidents
BM
Brian Moran
Jun-21
Caution
Citizen satisfaction with the overall maintenance of city streets
BM
Brian Moran
May-21
On Target
Total miles of city streets rehabilitated
Q3-20-21

The City continues to evaluate its pavement management techniques to ensure roadways last as long as possible.  In 2017, the City began utilizing a new technique called Micro Seal, which ensures that the City is maintaining asphalt streets between the time it's constructed and when it receives a mill and overlay treatment.

Caution
Sidewalk and curbing rehabilitated/constructed
BM
Brian Moran
Q3-20-21

During the first quarter of 2019, major sidewalk construction projects were completed along Hunt Road (new), Santavy Road (new), and throughout the Oakwood subdivision area (replaced). In addition, the trail system in Baytown was expanded by 59,022 square feet of 10' sidewalk that was completed along the newly built San Jacinto Boulevard.

Caution
Citizen satisfaction with the maintenance of sidewalks in Baytown
BM
Brian Moran
May-21

A significant increase (greater than 5%) was logged in this area from 2017-2018.  This comes as no surprise as the City invested significant resources in not only maintaining existing sidewalks but also installing new sidewalks in multiple areas of the community.

Caution
Citizen satisfaction with the availability of sidewalks
BM
Brian Moran
May-21
On Target
Total miles of trails and bike paths in Baytown
BM
Brian Moran
Q3-20-21

In the first quarter 2018-19, the Ward Road Loop trail was completed along with the final section of sidewalk on Santavy Road, connecting the San Jacinto Boulevard trail to Garth Road. In the third quarter, a trail was completed through Jenkins Park, with an additional connector trail currently under construction. Future plans are in place to continue adding trails and bike paths in Baytown over the next several years.

Caution
Percentage of signalized intersections with pedestrian crossings
BM
Brian Moran
Q3-20-21

As the City completes road projects or sidewalk projects that come to a road intersection, pedestrian crossings will be added to those intersections.  

Not Defined
Accomplishments Status Count
FY2020