Goal 5: Create additional Patrol Divisions.Strategic Direction |
Action Items | Accomplishments | Responsible Party - Lead | Funding Status | Performance Liaison | ||||
---|---|---|---|---|---|---|---|---|
Apr-20 | May-20 | Jun-20 | ||||||
Completed. | Completed. | Completed. | | |
|
|||
The plans to establish a Seventh Patrol Division are being reviewed. | The plans to establish a Seventh Patrol Division are being reviewed. | The plans to establish a Seventh Patrol Division are being reviewed. | | |
|
|||
A design-build contractor was selected in April 2019 to construct a new South Patrol facility, however due to extenuating circumstances, the contract will end when design is complete. Schematic designs and Design Development plans have been approved. Architect will begin Construction Documents when Construction Manager at Risk (CMAR) is selected. Interviews occurred 5/12-5/13.PMD is starting the contractual and M&C process. | A design-build contractor was selected in April 2019 to construct a new South Patrol facility, however due to extenuating circumstances, the contract will end when design is complete. Schematic designs and Design Development plans have been approved. Architect will begin Construction Documents when Construction Manager at Risk (CMAR) is selected. Interviews occurred 5/12-5/13.PMD is starting the contractual and M&C process. | A design-build contractor was selected in April 2019 to construct a new South Patrol facility, however due to extenuating circumstances, the contract will end when design is complete. Schematic designs and Design Development plans have been approved. Architect will begin Construction Documents when Construction Manager at Risk (CMAR) is selected. Interviews occurred 5/12-5/13.PMD is starting the contractual and M&C process. | | |
|