DASHBOARD: All ChartsTPW - Transportation / Public Works |
| | Customer Satisfaction Survey average score > 3.3 Customer Satisfaction Survey average score > 4 |
| | Complete drainage reviews within 10 business days of being received 65% of the time Complete drainage reviews within 10 business days of being received 70% of the time |
| | # of lane miles of chip pavement seal coating applied. Apply 26 lane miles of pavement chip coating on an annual basis. |
| | % of streets that are scored at 70% or better. Percent of streets that are scored at 70% or better. |
| | Street rating by % - All Types Percent of streets that are scored at 70% or better. |
| | # of drainage inlets cleaned and inspected. Clean and inspect 6,350 drainage inlets on an annual basis. |
| | Number of drainage inlets cleaned & inspected FYTD Clean and inspect 6,350 drainage inlets on an annual basis. |
| | # open channel drainage system miles restored Maintain or restore 5.76 miles of the open channel drainage system on an annual basis. |
| | Drainage miles maintained or restored FYTD Maintain or restore 5.76 miles of the open channel drainage system on an annual basis. |
| | # acres of vegetation in drainage easements mowed. Mow 1,200 acres of vegetation in drainage easements on an annual basis. |
| | Acres Mowed FYTD Mow 1,200 acres of vegetation in drainage easements on an annual basis. |
| | # of Notifications of Intent (NOIs) issued for Railroad Quiet Zones. (ARCHIVED) Issue 12 Notifications of Intent (NOIs) for the installation of Railroad Quiet Zones on an annual basis. |
| | NOIs Issued FYTD (ARCHIVED) Issue 12 Notifications of Intent (NOIs) for the installation of Railroad Quiet Zones on an annual basis. |
| | # instances where traffic signals go into all-red flashing mode. Reduce failure of traffic signals going into flashing red mode to 1,200 occurrences on an annual basis. |
| | # all-red flashing instances FYTD Reduce failure of traffic signals going into flashing red mode to 1,200 occurrences on an annual basis. |
| | % of regulatory signs that are put into place within 2 hours of notification Traffic regulatory sign replacement within 4 hours of damage notification 95% of the time. |
| | % of operational capability on streetlight fixtures and freeway segments. (ARCHIVED) Maintain 85% operational capability on arterial street light fixtures. |
| | Maintain an annual Community Rating System (CRS) rating of Class 8 or better. (ARCHIVED) Maintain an annual Community Rating System (CRS) rating of Class 8 or better. |
| | % of time floodplain permit process is completed within 60 calendar days (ARCHIVED) Complete a floodplain development permit internal review process within 40 calendar days 80% of the time. |
| | # potholes filled and repaired. (ARCHIVE) Fill and repair 40,000 potholes on an annual basis. |
| | Potholes Filled FYTD (ARCHIVE) Fill and repair 40,000 potholes on an annual basis. |
| | # of linear feet of new sidewalk programmed for installation. (ARCHIVE) Programming the installation of 31,200 feet of new sidewalk on an annual basis. |
| | # of linear feet completed FYTD (ARCHIVE) Programming the installation of 31,200 feet of new sidewalk on an annual basis. |
| | Reduce the incidence of customer-reported potholes on a year over year basis Repair potholes within 48 hours 90% to 95% of the time. |
| | Conversion of residential street lights to LEDs within 75% MMA. Conversion of residential street lights to LEDs within 75% MMA. |
| | IPRC reviews completed within 10 business days 95% of the time IPRC reviews completed within 10 business days 95% of the time |
| | Retime 1/3 of the City's Signal Corridors annually to optimize traffic flow with changing in traffic patterns and volumes. Retime 1/3 of the City's Signal Corridors annually to optimize traffic flow with changing in traffic patterns and volumes. |
| | Propose 10,000 linear foot of sidewalk annually within the 75% MMAs. Propose 10,000 linear foot of sidewalk annually within the 75% MMAs. |
| | Provide resolution for all citizen requests related to Traffic Engineering within 60 days. Provide resolution for all citizen requests related to Traffic Engineering within 60 days. |
| | Complete small cell node review within 15 Calendar days 90% of the time. Complete small cell node review within 15 Calendar days 90% of the time. |
| | Complete traffic studies within 10 business days 85% of the time Complete traffic studies within 10 business days 85% of the time |
| | Perform condition assessment of X miles of critical storm drains each year to understand condition and project needs Perform condition assessment of 25 miles of critical storm drains each year to understand condition and prioritize project needs |
| | "Utility" Permitting: Respond to 90% of workflow in permitting within ___ days "Utility" Permitting: Respond to 90% of workflow in permitting within ___ days |
| | "Utility" Permitting: Respond to 90% of workflow in permitting within ___ days Utility Inspections: Perform inspections on 50% of all "Utility" projects that have a permit issued. |
| | Utility Coordination: 90% of Critical Projects achieve "cleared status" prior to construction start date. Utility Coordination: 90% of Critical Projects achieve "cleared status" prior to construction start date. |
| | PIR Closeout: Close 90% of PIRs within _ days of submission. PIR Closeout: Close 90% of PIRs within _ days of submission. |
| | Perform initial site visit for non-emergencies within 72 hours. Perform initial site visit for non-emergencies within 72 hours. |
| | Perform initial site visit for emergencies within 72 hours. Perform initial site visit for emergencies within 72 hours. |